![]() Smith Lake Waterline
Jimmy Shifflett's crew has completed J-672; Smith Lake Waterline. They laid 24" DIP water
main at the future Smith Lake Park. They persevered despite very wet and soggy conditions.
Jimmy's crew is currently at J-673; Marywood Subdivision. There, they are removing and
replacing concrete storm pipe that was not installed properly by the previous contractor.
When they are done at Marywood they will go to J-670; Hochmuth Hall in Quantico for a more
"challenging" storm sewer upgrade. Great work guys!
![]() Marywood Subdivision |
![]() Geiger Slope Repair
DeDe and crew have been very busy. They spent some time out at J-651; MCB 2, MCB 3 &
Camp Barrett. After MCB 2 they went to J-643; Geiger Slope and completed the redesigned
slope repair. Dirt was trucked in as DeDe carefully worked it back up on the slope and then put
coconut fabric over the hill to slow future erosion. After a very successful emergency job in
Maryland, J-681; Carderock Test Pit, they returned to J-671; Woodleigh Subdivision and have
completed the clearing and stripping operations and are about 90% complete with the bulk dirt
moving. Great job guys!
![]() Woodleigh Subdivision |